Data last updated: July 2022
Documents
Report on implementation of the modified system for allocation of regular resources for programmes - 16 July 2012
In decision 2008/15, the Executive Board endorsed the modified system for
\
allocation of regular resources for programmes, originally adopted in 1997. It
\
decided to maintain the system, with two modifications: (a) adopt the World Bank
\
classification of “high income” status as the country threshold for graduation from
\
receiving regular resources; and (b) raise the minimum level of regular resource
\
allocation from $600,000 to $750,000 for all programme countries, except in those
\
otherwise included in multi-country programmes.
\
This report responds to the Executive Board request for a report on
\
implementation of the modified system and presents lessons learned since 2008. A
\
draft decision is included in section IV.
Sudan Gender Equality 2018
Sudan Gender Equality Thematic Report 2018
Sudan Social Inclusion 2018
Sudan Social Inclusion Thematic Report 2018
Sudan Safe and Clean Environment 2018
Sudan Safe and Clean Environment Thematic Report 2018
Sudan WASH 2018
Sudan WASH Thematic Report 2018
Sudan Child Protection 2018
Sudan Child Protection Thematic Report 2018
Sudan Education 2018
Sudan Education Thematic Report 2018
Sudan Nutrition 2018
Sudan Nutrition Thematic Report 2018
Sudan Health 2018
Sudan Health Thematic Report 2018
Sudan CER 2018
Sudan Consolidated Emergency Report 2018