Data last updated: September 2023
Documents
Report on implementation of the modified system for allocation of regular resources for programmes - 16 July 2012
In decision 2008/15, the Executive Board endorsed the modified system for
\
allocation of regular resources for programmes, originally adopted in 1997. It
\
decided to maintain the system, with two modifications: (a) adopt the World Bank
\
classification of “high income” status as the country threshold for graduation from
\
receiving regular resources; and (b) raise the minimum level of regular resource
\
allocation from $600,000 to $750,000 for all programme countries, except in those
\
otherwise included in multi-country programmes.
\
This report responds to the Executive Board request for a report on
\
implementation of the modified system and presents lessons learned since 2008. A
\
draft decision is included in section IV.
Zambia WASH 2018
ambia WASH Thematic Report 2018
Zambia Education 2018
Zambia Education Thematic Report 2018
Zambia Health 2018
Zambia Health Thematic Report 2018
Uganda HIV and AIDS 2018
Uganda HIV and AIDS Thematic Report 2018
Tanzania WASH 2018
Tanzania WASH Thematic Report 2018
Tanzania Health 2018
Tanzania Health Thematic Report 2018
South Sudan Nutrition 2018
South Sudan Nutrition Thematic Report 2018
South Africa WASH 2018
South Africa WASH Thematic Report 2018
South Africa Education 2018
South Africa Education Thematic Report 2018